Interference Checks And Clash Resolution
At every stage, interdisciplinary interference checks are done by our BIM Coordinators in the models to negate the clashes that might be occurring after individual MEP, Architecture and Structure models are prepared. Errors and omissions which are often undetected in twodimensional drawings can be visually detected and resolved during project reviews with BIM. This allows spatial conflicts between disciplines to be tracked and resolved before commissioning construction which assures negligible design related disruptions in the site works. Our team at SABS is well versed with Navisworks and its uses to produce a clash free model.